New Road Indoor Substation (South Africa) |
26-05-2010 |
New Road Comprises of a 132/11kV indoor cellular substation presently operated at 88kV but ready for 132kV change –over |
|
|
|
|
Graaff-Reinet 66/11kV Substation (South Africa) |
27-05-2010 |
Supply, installation, testing & commissioning of electricity infrastructure to Graaff-Reinet 66/11kV Substation Replaced new equipment on 66kV incomer (3 x Voltage Transformers, 6 x Current Transformers & 2 x Circuit Breakers, installed new 20 MVA Transformer, installed and removed old Switchgear Panels, |
|
|
|
|
Burnstone Substation (Balfour) (South Africa) |
03-08-2010 |
60MVA 88/11kV Substation |
|
|
|
|
Mbombela 2010 Stadium 132/11kV Substation -Nelspruit (South Africa) |
29-03-2010 |
Turnkey Design and Construction of the 2010 stadium supply, 132/11kV 40MVA Substation - Nelspruit |
|
|
|
|
Maguga Dam Substation (Swaziland) |
27-07-2009 |
Appointed by SEC to construct the Substation for KOBWA project. the main purpose of this substation is to generate 66 kV (2 x 15 MVA) into the Swaziland grid. The project consisted of the Maguga Substation next to the turbine house and is connected via a 66 kV line to Nginamadolo substation which is the distribution point into the grid, both Maguga and Nginamadolo were part of this project. |
|
|
|
|